• H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

  • H20 Lab

    Public Infrastructure

    H20 Lab, Borgerhout, Antwerp

Open Oproep 1209: A suspension bridge between two quays

The proposed addition is in the first place a link between two buildings, a (suspension) bridge between two quays. This intervention introduces a new circulation pattern: an L-formed corridor with possible resting places on three locations (the rotunda, the bridge and the patio) links the two buildings. Secondly the bridge can be inhabited. The meeting-room, a representative function, is housed in the hanging volume.

  • Location
  • Borgerhout, Antwerp
  • Size
  • 500 m2
  • Budget
  • € 1.000.000,00
  • Status
  • Completed
  • Type
  • Open oproep
  • Date
  • 2001-2004
  • Client
  • Ministery Flemish Community
  • Team
  • Goedele Desmet
  • Ivo Vanhamme
  • Jean-Michel Culas
  • External consultation
  • Bureau Bouwtechniek
  • BAS bvba
  • Daidalos Peutz