• Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

  • Aux Parcs

    Housing

    Aux Parcs, Charleroi

61 + 90 housing units

This social housing project has been split in two phases: one first (realized) part of 61 housing units and one second (ongoing) part of 90 housing units. The project is organized in 5 distinct blocks, each surrounding a central and collective green garden. Accessible alleys in between the blocks link the existing neighbourhood to a new park in the back, which is an extension of the existing Lambert Park, and which improves the active mobility around the project with a continuous bicycle lane. The proposed architecture offers a diversity in the typologies, favouring the social mix. By differentiating the building scale, - taller on one side facing the big green area and shorter on the other side facing the existing workers’ attached houses, we create an architecture respectful to the context.

  • Location
  • Charleroi
  • Size
  • 18.238 m2
  • Budget
  • € 34.989.003,00
  • Status
  • Working drawings
  • Type
  • Competition 1st Place
  • Date
  • 2016 – 2024 (I) & 2020 – (II)
  • Client
  • La Sambrienne
  • Team
  • Goedele Desmet
  • Ivo Vanhamme
  • Brigitte Pinte
  • Agathe Julienne
  • Marie Lemaître
  • External consultation
  • Venac
  • Genie tec
  • Ney & Partners
  • Greisch
  • Zeppelin Collectif
  • Ellyps

Related projects